List each role, its hours and its hourly cost to the agency. Add overhead and your target margin to get the project price and blended hourly rate.
Quick answer: Direct cost = Σ hours × cost per hour. For example, with overhead of 30% and target margin of 30%, the project price is $4,735.71.
Add each person’s hours at their cost, load it with overheads (office, software, management and idle time), then add the target profit margin. The example team costs about $3,315 fully loaded; a 30% margin gives a price of about $4,740 — a blended rate of about $68 an hour.
Price on margin, not markup: a 30% margin needs the price to be cost ÷ 0.7.
For a single specialist, the Consulting Rate Calculator builds a day rate from income needs.
| Team | A list — add or remove items as needed. |
|---|---|
| Overhead | A percentage. Rent, software, admin staff, sales — as % of direct labour cost. |
| Target margin | A percentage. |
Using the calculator’s example values (shown in US dollars and metric units — the calculator itself adapts to your country):
| Team | 3 × Role |
|---|---|
| Overhead | 30% |
| Target margin | 30% |
| Project price | $4,735.71 |
|---|---|
| Blended hourly rate | $67.65 |
| Fully loaded cost | $3,315.00 |
| Profit | $1,420.71 |
We re-ran the example with each input 10% higher to see which ones move the project price most:
Focus on the first of these when you want to change the result. The calculator shows the biggest lever for your own numbers under the result.
Results are estimates for planning. They are not financial, tax or legal advice.
A single hourly rate across the whole team: project price ÷ total hours.
Many aim for 20–40% project margin after overhead.
Start from cost to know your floor, then check the result against market billing rates.
Many agencies find overheads add 25–50% on top of direct staff cost. Calculate yours from last year’s non-billable costs divided by billable staff cost.
Direct cost = Σ hours × cost per hour. Loaded cost = direct cost × (1 + overhead). Price = loaded cost ÷ (1 − target margin).
You need team, overhead and target margin. Example values are pre-filled, and the calculator converts between metric and imperial units and any currency.
If target margin is 10% higher, the project price rises by 4.5% to $4,947.76. If overhead is 10% higher, the project price rises by 2.3% to $4,845.00.