Date Difference Calculator

Enter a start date and an end date. The calculator counts calendar days, weeks and working days (Monday to Friday).

Quick answer: Days = end date − start date (+1 if the end date is included). For example, the days is 90.

How the Date Difference calculation works

  • Days = end date − start date (+1 if the end date is included)
  • Working days = days that fall Monday to Friday

Counting days between dates

The calculator counts calendar days, weeks and approximate months, plus working days from Monday to Friday. Ninety days from today is 12 weeks and 6 days, with about 64 working days.

Include the end date when counting both the first and last day — for hotel nights, do not; for the number of days of an event, do.

Working days and holidays

Working-day counts exclude weekends but not public holidays, which differ by country and region. Subtract holidays manually for deadlines and notice periods. To find a date a number of days ahead, use the Add Days to Date Calculator.

What you need for the Date Difference Calculator

Start dateA calendar date.
End dateA calendar date.
Include the end dateTick if it applies.

How to use the Date Difference Calculator

  1. Check the Region line at the top of the calculator. Your country, currency and units are detected automatically; change them if needed.
  2. Enter start date, end date and include the end date. Example values are filled in so you can see how it works.
  3. Read your result: the days appears instantly, with weeks and days, working days (mon–Fri) and approximate months underneath.
  4. Use Copy result, Share link or Print to keep the answer. Nothing you type is sent to our servers.

Date Difference calculation example

Using the calculator’s example values (shown in US dollars and metric units — the calculator itself adapts to your country):

Inputs
Start dateOct 27, 2026
End dateJan 25, 2027
Include the end dateNo
Results
Days90
Weeks and days12 weeks, 6 days
Working days (Mon–Fri)64
Approximate months3

Assumptions and limitations of the Date Difference Calculator

  • Public holidays are not excluded from working days.

Limitations

  • Results are estimates based on the numbers you enter. Check important decisions with a qualified professional.

Date Difference Calculator FAQs

How many days are between two dates?

Subtract the earlier date from the later one. By convention the start date is counted and the end date is not.

Should I include the end date?

Include it when counting days of an event (a Monday–Friday conference is 5 days); exclude it for durations like “days until”.

Are public holidays counted as working days?

Here, yes — subtract your local public holidays from the working-day total.

How many weeks are in a year?

52 weeks and 1 day (2 days in a leap year).

What formula does the Date Difference Calculator use?

Days = end date − start date (+1 if the end date is included). Working days = days that fall Monday to Friday.

What do I need to use the Date Difference Calculator?

You need start date, end date and include the end date. Example values are pre-filled, and the calculator converts between metric and imperial units and any currency.

Embed this calculator on your website

Free for any website or blog. Paste this code where the calculator should appear — it resizes itself and needs no sign-up.