Enter a start time and an end time. If the end time is earlier than the start, the calculator assumes it is the next day.
Quick answer: Duration = end − start (+24 h if the end is earlier). For example, with breaks of 30 min, the duration is 8 h.
From 9:15 to 17:45 is 8 hours 30 minutes; minus a 30-minute break, that is 8 hours worked — 8.0 in decimal hours, or 480 minutes.
Shifts that cross midnight count correctly: 22:00 to 06:00 is 8 hours.
For a full week of shifts with overtime and pay, use the Hours Worked Calculator.
| Start time | A time of day. |
|---|---|
| End time | A time of day. |
| Breaks | A number (min). |
Using the calculator’s example values (shown in US dollars and metric units — the calculator itself adapts to your country):
| Start time | 09:15 |
|---|---|
| End time | 17:45 |
| Breaks | 30 min |
| Duration | 8 h |
|---|---|
| Decimal hours | 8 |
| Minutes | 480 |
We re-ran the example with each input 10% higher to see which ones move the duration most:
Focus on the first of these when you want to change the result. The calculator shows the biggest lever for your own numbers under the result.
Divide by 60. 8 hours 30 minutes is 8.5 hours.
Enter the start and end times as normal; the calculator adds 24 hours when the end time is earlier.
Use the hours worked calculator to add several days together.
Divide the minutes by 60. 7 hours 40 minutes = 7 + 40 ÷ 60 = 7.67 hours.
Duration = end − start (+24 h if the end is earlier). Minus breaks.
You need start time, end time and breaks. Example values are pre-filled, and the calculator converts between metric and imperial units and any currency.
If breaks is 10% higher, the duration falls by 0.6% to 7 h 57 min.