List each part of the project and its estimated cost. The calculator adds permits and a contingency buffer for the problems every renovation uncovers.
Quick answer: Subtotal = sum of item costs. For example, with permits and design fees of $500.00 and contingency of 15%, the total budget is $35,575.
Renovations almost always uncover something: rotten joists, old wiring, hidden damp. A 10–15% contingency is standard for a newer home and 20% or more for older properties. In the example, $30,500 of planned work plus permits and a 15% buffer gives a budget of about $35,600.
Kitchens and bathrooms are typically the most expensive rooms per square metre, because they combine plumbing, electrics, tiling and fitted units.
| Project items | A list — add or remove items as needed. |
|---|---|
| Permits and design fees | An amount in your currency. |
| Contingency | A percentage. 10–20% is typical; use more for older homes. |
Using the calculator’s example values (shown in US dollars and metric units — the calculator itself adapts to your country):
| Project items | 5 × Item |
|---|---|
| Permits and design fees | $500.00 |
| Contingency | 15% |
| Total budget | $35,575 |
|---|---|
| Items subtotal | $30,500 |
| Contingency | $4,575.00 |
The same example converted to local units and currencies. Money amounts are scaled illustrations, not current local prices — enter your own in the calculator.
We re-ran the example with each input 10% higher to see which ones move the total budget most:
Focus on the first of these when you want to change the result. The calculator shows the biggest lever for your own numbers under the result.
Material estimates include the waste allowance you set. Check quantities with your supplier before ordering.
10–15% for newer homes and 20% or more for older homes where hidden problems are common.
Waste removal, temporary accommodation, permits, design fees, delivery charges and finishing items like handles and trims.
Yes. Three quotes per trade is common, and it helps you check the numbers you enter here.
Usually kitchens, bathrooms, extra bedrooms or living space, and energy efficiency. Highly personal finishes add the least — design for the likely buyer if you plan to sell within a few years.
Subtotal = sum of item costs. Contingency = subtotal × contingency %. Total = subtotal + contingency + permits.
You need project items, permits and design fees and contingency. Example values are pre-filled, and the calculator converts between metric and imperial units and any currency.
If contingency is 10% higher, the total budget rises by 1.3% to $36,033. If permits and design fees is 10% higher, the total budget rises by 0.1% to $35,625.