Enter the volume of concrete you need and the mix ratio. The calculator converts it to dry materials: cement bags, sand, aggregate and water.
Quick answer: Dry volume = wet volume × 1.54. For example, with concrete volume of 1 m³, cement bag size of 50 kg and water–cement ratio of 0.5, the cement bags is 7.
Dry materials shrink when mixed with water because sand fills the gaps between stones and cement fills the gaps in sand. The 1.54 factor accounts for this.
Sand and aggregate contain air gaps that the cement paste fills, so the dry materials take up about 54% more volume than the finished concrete. For 1 m³ of 1:2:4 (M15) concrete you need about 317 kg of cement — roughly 7 bags of 50 kg — plus 0.44 m³ of sand and 0.88 m³ of aggregate.
Water–cement ratio drives strength: more water makes concrete easier to place but weaker. Around 0.45–0.5 is typical for site-mixed concrete. For structural work, follow the engineer’s mix design.
| Concrete volume | A bulk volume (m³, cu yd). |
|---|---|
| Mix ratio (cement : sand : aggregate) | Choose one: 1 : 1.5 : 3 (about M20 / C20); 1 : 2 : 4 (about M15 / C15); 1 : 3 : 6 (about M10 / C10); 1 : 4 : 8 (lean mix). |
| Cement bag size | A weight (kg, lb). Common sizes: 50 kg, 25 kg, 94 lb. |
| Water–cement ratio | A number. |
Using the calculator’s example values (shown in US dollars and metric units — the calculator itself adapts to your country):
| Concrete volume | 1 m³ |
|---|---|
| Mix ratio (cement : sand : aggregate) | 1 : 2 : 4 (about M15 / C15) |
| Cement bag size | 50 kg |
| Water–cement ratio | 0.5 |
| Cement bags | 7 |
|---|---|
| Cement | 317 kg |
| Sand | 0.44 m³ |
| Aggregate (gravel) | 0.88 m³ |
| Water | 158 L |
The same example converted to local units and currencies. Money amounts are scaled illustrations, not current local prices — enter your own in the calculator.
We re-ran the example with each input 10% higher to see which ones move the cement bags most:
Focus on the first of these when you want to change the result. The calculator shows the biggest lever for your own numbers under the result.
Material estimates include the waste allowance you set. Check quantities with your supplier before ordering.
About 8 bags of 50 kg using a 1:1.5:3 nominal mix.
One part cement, two parts sand and four parts aggregate by volume.
Too much water weakens concrete. A water–cement ratio of 0.45–0.55 is typical.
About 28.8 bags of 50 kg fill 1 m³ of loose cement. For concrete, 1 m³ of M20 (1:1.5:3) needs about 400 kg of cement — 8 to 9 bags; M15 (1:2:4) about 320 kg, or 6 to 7 bags.
Dry volume = wet volume × 1.54. Cement volume = dry volume × cement parts ÷ total parts. Cement weight = cement volume × 1,440 kg/m³. Water = cement weight × water–cement ratio.
You need concrete volume, mix ratio (cement : sand : aggregate), cement bag size and water–cement ratio. Example values are pre-filled, and the calculator converts between metric and imperial units and any currency.
If cement bag size is 10% higher, the cement bags falls by 14.3% to 6.